Hampton Beach Infrastructure Project
The challenge presented to R. Zoppo Corp. for the Town of Hampton New Hampshire was how to construct infrastructure improvements to facilitate the redevelopment of the Hampton Beach area... Read More
Taunton River Desalination Project
The project involves the construction of a 5 MGD desalination plant in Dighton on the banks of the Taunton River. Our contract includes all of the civil construction... Read More
Wachusett and Quabbin Reservoir
Demolition and reconstruction of the Wachusett Dam Spillway as well as drainage and spillway repairs at the Quabbin Reservoir. The project also involves installation of new geotechnical... Read More
Wachusett Dam PCB Removal
Removal of PCB contaminated concrete walkway and replacement on the crest of the Wachusett Dam. All demolition and removal is to be accomplished in full containment... Read More
Lexington Noise Wall
Construction of a noise wall nearRobinson Road along the acceleration lane from Route 3 to Rt. 128/1-95 South in Lexington. Noise wall foundations are being constructed in varying... Read More
Route 24 Bridge Replacement
Replacement of the existing OCR Access Bridge over Route 24 in the town of Randolph. Work consists of complete demolition of the entire bridge superstructure and partial... Read More
Sagamore / Bourne Bridge Repairs
Project Consisted of Bridge Deck Repairs and Paving Repairs at the Sagamore and Bourne Bridges. Work at the Sagamore Bridge (Contract Value $5,600,000, construction time 75 days) consisted of... Read More
Ames Street Dedham Bridge Rehabilitation
The Ames Street Bridge is a historical stone and concrete multi-arch structure that spans the Charles River in Dedham Massachusetts. Originally constructed in the mid 1800’s with several... Read More
New Bedford Sewer & Watermain Improvements
The work of this contract consists of furnishing all necessary labor, materials and equipment required for the cleaning of approximately 19,000 LF of a cast-in-place CSO... Read More
Woonsocket Dam
Design and construct a cofferdam system to block off flow and adequately dewater four (4) tainter gates for conducting all necessary work associated with the repair... Read More
I90 Prudential Tunnel Roadway Construction
The work to be done under this contract consists of furnishing all necessary labor, materials and equipment required for the installation of new barriers, concrete block closure Walls... Read More
East Boston By-Pass Road
Constructing a modern roadway through an abandon railroad ROW involved combining our abilities with a large number of our subcontractor partners. The 2500 lf ROW was cleared and grubbed... Read More